Malaysia Needs RM225.9 Million to Repair Monsoon-Hit Federal Roads
The Ministry of Works (KKR) estimates RM225.9 million is required to repair federal roads damaged by the 2025/2026 Northeast Monsoon.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed